Grinders Party – Runway Repairs

In our ongoing struggle against the raise and fall of our soil (and runway), the Field Maintenance team and volunteers, led by Paul G., gathered to grind the ridges formed along the cracks between the asphalt and concrete. These ridges were quite hard on small planes with light landing gear and small tires. So far, the results have been wonderful.

Shout out goes to Dave, Mike, Dan, Mike, Wayne, Bob, and Paul !

Author

Leave a Reply

Your email address will not be published. Required fields are marked *